Overview of promotion system
Electricity generated from renewable energy is mainly promoted through a price regulation. Plant operators may choose between two options (art. 1, 24 RD 661/2007), a guaranteed feed-in tariff and a guaranteed bonus or premium on top of the electricity price on the free market. Furthermore, investments in systems and equipment required for the generation of renewable electricity may be deducted from tax.
Overview of access to the grid
Systems that generate electricity from renewable energy sources are statutorily entitled to connection to and usage of the grid at a priority. The plant operator may be contractually entitled to an expansion of the grid, of which he shall bear the cost, if the connection of the system to the grid requires a grid expansion. Apart from that, the grid operator is obligated to expand his grid according to the general provisions of energy law.
|
|